ABB RCNA-01 User Manual Page 50

  • Download
  • Add to my manuals
  • Print
  • Page
    / 474
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 49
46 Installing the drive
ACH550-01 User's Manual
Checking the insulation of the assembly
Drive
Do not make any voltage tolerance or insulation resistance tests
(e.g. hi-pot or megger) on any part of the drive as testing can
damage the drive. Every drive has been tested for insulation
between the main circuit and the chassis at the factory. Also,
there are voltage-limiting circuits inside the drive which cut down
the testing voltage automatically.
Supply cable
Check the insulation of the supply (input) cable according to
local regulations before connecting to the drive.
Motor and motor cable
Check the insulation of the motor and motor cable as follows:
1. Check that the motor cable is connected to the motor, and
disconnected from the drive output terminals U2, V2 and
W2.
2. Measure the insulation resistance between each phase
conductor and the Protective Earth conductor using a
measuring voltage of 500 V DC. The insulation resistance of
an ABB motor must exceed 10 Mohm (reference value at
25 °C or 77 °F). For the insulation resistance of other
motors, please consult the manufacturers instructions.
Note: Moisture inside the motor casing will reduce the
insulation resistance. If moisture is suspected, dry the motor
and repeat the measurement.
ohm
M
3~
U1
V1
W1
PE
Page view 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 473 474

Comments to this Manuals

No comments